Tuesday, August 19, 2008
Our kitchen
This is what the kitchen looked like at the beginning of the weekend. As you can see I have painted the walls so they are the same colour as the dining room.
We moved the fridge along and built another unit so that we could extend the work top. It took some sawing and screwing screws is quite difficult when both the electric screwdriver and the drill needed charging and the hammer drill was far too powerful.
We then had to cut the worktop to size both longways and widthways. That's a lot of cutting! Plus an unbelieveable amount of sawdust. There were more screws to hold it to the units and then I had to glue the end to the bit by the fridge.
Ta da! I now have an extra 66cm of worktop which makes a huge amount of difference. We are having Helen and Alan over for dinner on Friday to test it out!
Ikea do wicker baskets that will fit perfectly (we know - we got some for Gemma last time we went and she didn't collect them until after we had tested them out in our kitchen!)
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment