Monday, November 22, 2010

Bathroom Day 2

Well at the end of day 2 there isn't a lot left in our little bathroom and we have some good things and some bad things.

I'm not sure how much of a relaxing week off this is going to be with tradesmen turning up at 8 every day!

We still have a loo with a bucket flush system with water out of a temporary tap!


We have holes in the ceiling for the new lights and new sockets for the power for all our funky gadgets.



The good news was that the floor was nearly as bad as we feared and wasn't rotten. It doesn't need to be replaced and as long as it dries out tonight with the help of a heater then we can just board over the top for the tiles.

Bad news was that most of the plaster came off the wall with the remaining tiles and the plasterer is on holiday! We are going to have fancy waterproof plasterboard which should provide a nice surface for the tiles.



We also had all the rest of the bathroom stuff delivered and all seems ok apart the vanity unit for the sink is the wall unit rather than the floor unit. I've left that up to the fitter and the bathroom shop to sort out a resolution for that problem!