Tuesday, November 30, 2010

Bathroom Day 8

Not a lot has happened in the bathroom on day 8. The plumber made his way through the inch or so of snow that we had this morning to make it to our house and got all of the rest of the grouting done.

Then at 9:30 he left to go get a piece of plumbing material for the new toilet. It took him 2 hours to get through the gridlocked traffic to the plumbing shop and then spent an hour getting half way back here when his wife phoned to say that she had taken the kids to the park and locked herself out. So by the time he had rescued them from the sub-zero temperatures and got back here it was 3:30 and as he needed 2 hours for the grout on the floor tiles to dry to install the new toilet decided to call it a day.




We had a bit of a mission getting home. 2 trains were broken down outside purley blocking both tracks so trains were backed up trying to get into East Croydon and there was another broken down train at Edenbridge meaning going to Hayes and getting the bus was also impossible. I managed to squeeze onto a West Croydon train after about 45 minutes of waiting at London Bridge. Ollie gave up with London Bridge as it was too busy and decided to tube it to Elephant and Castle and then get a train to Mitcham where he could pick up the tram.

My journey took a total of 3 hours and Ollie's 3 and a half. We got home to find that there is over 9 inches of snow here. We've measured it with a ruler so it's no exaggeration. I can't remember ever seeing snow that deep! Talking to the lady next door this is common for this area and they always get lots when it snows. I think we may be spending tomorrow working from home.

No comments: